Services Include:
- Engine Component Balancing
- Cylinder Block Preparation
- Milling
- Boring
- Honing
- Align Honing
- Clearancing for Stroker Crankshaft Assemblies
- Connecting Rod Reconditioning
- Piston Machining
- Cylinder Head Machining
- Milling
- Cylinder Head Porting
Honing and Boring Services
- Cylinder Hone - Deck Plates Nominal Size
- Cylinder Hone - Piston Fit to Deck Plates
- Cylinder Boring .030 over Max
- Cylinder Boring .030 to .060
Align Honing and Boring Services
- Align Hone 2 bolt block
- Align Hone 4 bolt block
- Align Hone Crossbolted block (Ex. Mod, LSx FE)
- Align Bore to Nominal Bore Size
Decking and Block Deburr Services
- Deck Block- Cleanup Cut
- Deck Block- Max 30
- Deburr Block- Major surfaces and edges, oil passages, bottom of bores
- Deburr Block- Full Race Prep
Block Sleeving and Cam Bearings
- Install Sleeves-8 Sleeves installed and decked
- Install 1 Sleeve 1 Sleeve installed decked
- Install Roller Cam Bearings
- Install and Remove Cam bearings- Regular bearings
Miscellaneous Block Procedures
- Wash and Degrease Block
- Burn and Blast Block
- Measure and Inspect Block-Bore Size, Main Bore Size, Deck Height
Piston and Rod Procedures
- Remove rods from Pistons- Press Fit
- Remove rods from Pistons- Full Floating
- Pin Fit Rods- .003 max stock removal
- Pin Fit Rods-.003-.005
- Pin Fit Pistons-.003 max stock removal
- Pin Fit Pistons-.003-.005
- Rod Bearing Clearances- clearances done to .0002 tolerance
Head and Intake Machining Operations
- Mill intake surfaces max .030 - no china wall
- Mill intake surfaces max .030 and china wall
- Mill Cylinder Heads max .010
- Mill Cylinder Heads max .030
- Add Fuel Injection Bosses
Cylinder Head Operations
- Hand Porting & CNC Porting
- Valve Job- 16 Ports 3 angle
- Valve Job- 24 Ports 3 angle
- Valve Job- 32 Ports 3 angle
- Disassemble Heads and degrease
- Assemble Heads
- Install Guides- 16 Guides and hone to size
- CC Chamber
- Flow Test Cylinder Heads- 1 intake and 1 exhaust port
Click here to read more about our "Butler Process" for machining, rotating assembly balancing, engine, and engine kit preparation.
